![]() “The project will give the city more time to develop a permanent flood control plan so the water plant can remain safe and operational for the foreseeable future.”Ĭongress specifically named the project into law and funded its contract after residents requested support for the project. Samuel Briscoe, the Detroit District project manager. It is the first community directed funding project that the Detroit District has received in some time, so there was lots of excitement to do this one right,” said Capt. “This project has been in the works for some time. This beach nourishment is designed to reduce the risk of flood damage from Lake Michigan to the South Haven Water Filtration Facility. Beach nourishment also helps slow erosion occurring in the area of depletion. ![]() The tested-safe material will then be placed on South Haven’s public South Beach from the South Pier and extending 1,900 feet southward for beach nourishment.īeach nourishment returns sediment trapped between breakwaters to the natural shoreline drifting process. ![]() In coordination with the City of South Haven, the Corps of Engineers will dredge 57,300 cubic yards of material from the Black River Federal Channel. Army Corps of Engineers, Detroit District will begin hydraulically dredging the federal navigation channel and nourishing the South Haven Harbor shoreline next week. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |